Challenge

Changing platform
without disrupting daily use.

Your platform runs, but it is expensive, breaks often or relies on a tool nobody wants to maintain any more. We migrate it or put it back in order in batches, while the uses carry on.

MigrationBigQuerydbtTerraformAirflow

YOUR SITUATION

You will recognise yourself if…

  • Pipelines fail without warning, and you hear about it from a user.
  • The jobs are scripts only their author understands, or jobs in a tool whose licence is about to expire.
  • The cloud bill keeps climbing and nobody can say why.
  • You are changing cloud provider, or your Postgres database can no longer keep up with the volume.

THE DIAGNOSIS

What is really going on.

A migration rarely fails on the technology. It fails because years of jobs are copied across unchanged, though nobody remembers what they are for. Or because the old system is switched off before anyone has proved that the new one gives the same numbers.

A platform that breaks does not always need replacing, either. Often it lacks what nobody ever took the time to add: tests, monitoring, an environment described in code (see infrastructure as code), documentation. We start by checking that, before proposing to change everything.

When a migration is necessary, it is also a chance to delete. Anything that no longer feeds any use does not cross over.

THE SCENARIOS

Four starting points, four points of attention.

Where you are starting fromWhere toThe point of attention
Another cloudGoogle Cloud, described with Terraform.Access rights and incoming pipelines, to be redone properly rather than copied.
A Postgres database that is saturatingBigQuery, with Airflow orchestration.Queries written for a transactional database do not carry over as they are.
SAS, BO, Talend or QlikOpen-source dbt, on a data warehouse or a lakehouse.Business logic buried in years of jobs, to be found and sorted.
A recent but fragile platformThe same one, put back in order.Adding tests, monitoring and documentation without interrupting deliveries.

THE METHOD

What we do, in order.

01

Inventory what is still used.

Jobs, tables, reports, real users. What nobody reads will not be migrated.

02

Set up the target.

The environment is described in code, with its access rights, its automated tests and its continuous deployment.

03

Migrate in batches, in parallel.

The old and the new run side by side. We compare the results until they are identical, or the gap is explained.

04

Switch over, then switch off.

Dashboards and exports are reconnected batch by batch. The old system stops when nothing reads it any more.

05

Hand over.

Your team worked with us during the migration. It leaves with the documentation and command of the new tools.

THE RESULT

What you get.

  • A platform described in code, that can be recreated identically.
  • Tested and documented transformations, in an open-source tool the market knows.
  • Monitored pipelines, that alert when they fail.
  • A leaner scope, relieved of everything that no longer served a purpose.
  • A trained in-house team, and no vendor imposed.

FREQUENTLY ASKED QUESTIONS

What we are often asked.

Do we have to migrate everything at once?

No, and we advise against it. A migration in batches lets you check each scope and go back if a gap appears. The uses never stop at any point.

Which data warehouse should we move to?

BigQuery is our default choice. We also work on Redshift and Databricks. Our comparisons BigQuery or Snowflake and data warehouse or lakehouse set out the criteria.

Our team knows SAS or Talend, not dbt. Is that a problem?

It knows the business and the data, which takes longest to acquire. dbt is based on SQL. For the public sector, our format provides for a foundation built in 6 two-week sprints with skills transfer, then support.

WHAT COMES NEXT, WE BUILD TOGETHER

Your next project
starts with a conversation.

An idea, a pain point, a project to kick off? Let’s talk about what would make a difference for your teams.

Let’s talk about your project